Pakistan Bahu Development Project Environmental Impact Assessment 2007
Country
Year
2007
Summary
The purpose of this EIA study is to evaluate the proposed project activities, which are: construction of raised platforms (200 ft x 200 ft) at each of the well (Bahu-1, Bahu-2 and Bahu-3) location to house basic production facilities like water knock out vessel, corrosion injection package, construction of raised platform (300 ft x 300 ft) at Bahu-2 to accommodate central gathering facilities consisting of production & test headers, water knock out vessel, gas measurement system, construction of raised platform near Bahu-2 for the residential camp, constructing and laying of interfiled flowlines, main trunk line 10” dia x 20-22 km long for gas transmission to Panipur Plant. All the water drained from the water knock out vessel from each well will be sent to a nearby pit, lined with geo-membrane, for atmospheric evaporation for disposal as per environmental standards. The proposed activities will be measured against the Pakistan Environmental Protection Agency (Pak-EPA) standards, and against the international environmental guidelines, such as those of the World Bank.